Skip to content
Ecomdar — Sustainability Consulting

How to Prepare Your Factory’s First Carbon Footprint Without a Full-Time Sustainability Team

A first carbon footprint should not begin with buying software or choosing a report template. Start by defining what you need to measure and why. Then organize the evidence needed for calculations someone else can review.

Preparation can be coordinated through clear responsibilities within an existing team, with specialist support where needed. That does not mean every calculation is simple or technical expertise is unnecessary. It means creating a full-time department is not the only possible starting point.

Step 1: Understand the request

Is the request for a corporate inventory, one facility’s emissions, a product footprint or programme-specific information such as CBAM data?

These are not interchangeable report names. ISO 14064-1 addresses organization-level inventories; ISO 14067 concerns product carbon footprints. ISO also distinguishes the verification framework from quantification. [1, 2, 3]

Write a short brief naming the intended user, purpose, method, reporting period, outputs and any independent verification requirement. Do not promise a report fits a different purpose simply because it contains an emissions total.

Step 2: Map the boundary

Identify the entity, facilities and activities in the inventory, including the treatment of ownership, control and leased assets. Gather process descriptions, an equipment list and energy sources. Identify the emission sources to address under the selected framework and engagement. [4]

A source checklist might cover boilers, generators, vehicles, purchased electricity, refrigerants and process emissions, depending on the operation. These are prompts to investigate, not a claim that every source exists at every factory.

Step 3: Assign data owners

A practical division might give finance responsibility for invoices, utilities staff for meters and fuel, maintenance for equipment and refrigerant records, production for output and operating hours, and one coordinator for missing items.

These are suggested roles, not mandatory job titles. Each person needs to know which information to provide, its period and units, and who reviews it. Keep calculation preparation, internal review and independent verification distinct.

Step 4: Build a data register before writing the report

For each item, record the facility, source, period, value, unit, supporting record and data status. Retain original records rather than relying only on copied spreadsheet totals.

Check period coverage, duplicates, unit conversions and the difference between purchases and consumption. Where a meter is shared, document the allocation and its basis. Do not replace missing data with zeros. Completeness and transparency require gaps and assumptions to be visible. [4]

Step 5: Select methods and factors, then test the calculation

Do not use the first factor you find online. Check its suitability for the activity, units, location or grid and period, and record its source and version. Different sources may require activity-data calculations or other appropriate quantification methods. [5]

For purchased electricity, check Scope 2 Guidance and the requirements of the relevant accounting method. A marketing label on an energy purchase is not equivalent to evidence meeting emissions-claim criteria. [6]

Test a sample from the original record through to the reported total, then trace a reported figure back to its source. Reconcile totals and investigate unexplained changes before drawing conclusions.

Step 6: Deliver a file that can be updated

The package should explain boundaries, sources, methods, factors, assumptions, limitations and results. Keep calculations, an evidence index and the review record alongside the report.

Good preparation does not end with a PDF. Define a repeatable process for collecting records, naming files and approving changes. If facilities or methods change, assess the effect on comparisons before describing a change as better performance. [4]

Frequently asked questions

Is a spreadsheet enough, or do we need a platform?

A controlled spreadsheet may be a starting point if it preserves evidence, factors and versions and makes calculations inspectable. An application cannot repair a wrong boundary or missing data. GHG Protocol also states that its calculation tools are optional. [5]

How long does a first inventory take?

There is no single defensible promise. Timing depends on facilities, sources, record quality, scope and verification requirements.

Is independent verification always required?

Check the intended use and programme or customer requirements. Preparation and verification are different services. Do not label an inventory verified without a statement covering it.

Start with scope, not a promised outcome

Ecomdar helps organizations organize data, accounting boundaries and evidence for review, with support suited to the work and the team’s needs. A useful first step is identifying what exists, what is missing and who can provide it, then agreeing the support scope.

We prepare. The independent verifier verifies.

References

[1] ISO 14064-1:2018, public scope page. https://www.iso.org/standard/66453.html

[2] ISO technical committee, Mitigation Standards, including ISO 14067 product footprint scope. https://committee.iso.org/sites/tc207sc7/home/projects/published/mitigation-standards.html

[3] ISO 14064-3:2019, public scope page. https://www.iso.org/standard/66455.html

[4] GHG Protocol, Corporate Accounting and Reporting Standard. https://ghgprotocol.org/sites/default/files/standards/ghg%2Dprotocol%2Drevised.pdf

[5] GHG Protocol, Calculation Tools FAQ. https://ghgprotocol.org/calculation-tools-faq

[6] GHG Protocol, Scope 2 Guidance. https://ghgprotocol.org/scope-2-guidance